We chose the wrong MCU and rebuilt the entire board.
Compliance failures two weeks before DVT. Lost $40K.
Prototype worked perfectly. Factory said: redesign.
PCB spin #4 and still debugging basic power issues.
We burned $30K before realising we weren’t ready.
We didn’t know what we didn’t know — until too late.
We chose the wrong MCU and rebuilt the entire board.
AI PoweredAccelerate Electronics using AI

Hardware, without the blind spots.

Catch the $50K mistake before it happens. Validate requirements, architecture, compliance and risk — before your schematic editor opens.

10+
AI Analysis Engines
Days to Hours
Full pre-design audit
100%
Traceable decisions
What Accelix Produces

Everything your leadership team and sr. engineer would demand before signing off.

No schematics without an Accelix report. 10+ structured deliverables — the same outputs a $300/hr hardware consultant takes weeks to produce, within hours.

Market Intelligence
Market size, trends, and customer segments validated — so you build for real demand, not assumptions.
Competitor Analysis
Feature benchmarks, pricing gaps, and positioning mapped against every competing product in your space.
Design Specifications
Power envelopes, interface maps, performance targets — structured and traceable to every requirement.
Risk Register
Explicit risk ownership with mitigation. Supply chain, thermal, regulatory exposure — quantified upfront.
Product Architecture & Technical Approach
System-level architecture, bill of materials and end-to-end technical strategy all structured and traceable.
Engineering Computations
Power budget, battery life, thermal dissipation, timing margins — calculated before schematic freeze.
Detailed Program Approach
EVT/DVT gates, milestone planning, resource allocation, and manufacturing readiness — mapped before tooling spend begins.
Statement of Work
Measurable acceptance criteria and structured SOW — so design houses can’t move goalposts on you.
One real run, unedited

The actual workspace, with a real smart ring inside it.

Switch views in the toolbar and read what the run produced — 148 tables, 1241 rows, 24 sources. Real part numbers, lead times and ISO clauses, including the parts it could not answer.

Explore the workspace

Don't build it
until it passes.

Every constraint surfaced, every risk owned — before your schematic editor opens.